logo
 
  

JAMAICA

  
 

 

 

Jamaica Energy and Power 2005 Marine Consultant/ Offshore Manager
Construction of berthing face and underwater cofferdam for securing their 200 foot floating electric plant. Dredging of Basin.
600 foot of sheet piling with tie rods and anchor piles
300 foot concrete bulkhead

Dredging

 048a 051a   
     
Concrete Piling   
 01a 03a 04a 06a
     
Sheet Piling    
 045a 046a 050a 056a
     
Tubular Piling   
 059a 062a   
     
Concrete Pile Testing   
 039a 040a 041a  
     
  
back/ back to top/next